Tarakçıoğlu Mineral Coating and Production Industrial Building

SIGMA obtained the project permits for the factory in 2020, is in Yalova Industrial District.

Tarakçıoğlu Mineral Coating and Production Industrial Building
Tarakçıoğlu Mineral Coating and Production Industrial Building
Tarakçıoğlu Mineral Coating and Production Industrial Building comprises a basement, a ground floor, and the two upper floors are connected by a ramp.
LOCATION
Yalova
EMPLOYER
Atilla Tarakçı
YEAR
2020
SERVICES
Structural Design
SECTORS
Production and Manufacturing
Tarakçıoğlu Mineral Coating and Production Industrial Building

The hall has two designated areas servicing chrome plating production lines and grinding areas. There are also acidic or alkaline water tanks, benches, and cranes located in the halls. The production hall has a loading and unloading bay behind and an administration building with 4 levels in front. Personnel, administrative staff, and trailers entrances are located on different levels independently.

You can also take a look at these projects.

All Projects
OMM - Odunpazarı Modern Museum Building Information Modeling (BIM) 2017
Tarlabaşı 360 Structural Design 2020
Liberty Fabay Hotel Structural Design 2020
The Istanbul University Hasdal Campus Hospital Landscape Architecture 2021
Tashkent Index Architecture 2021

Associated Services

We position cookies on our website, limited to the purposes in the data policy and in accordance with the legislation. For detailed information about cookies and their management, you can review our data policy.